
Full kitchen view

Kitchen wall abutting dining room

View from kitchen facing living and dining room

Original kitchen cabinets and sink

Kitchen rear wall

View of living room and dining room from front door

dining room

dining room

Walkthrough before walls removed
Press the PLAY button on the image below to see the video
Plaster between dining room and kitchen gone

Plaster between hallway and living room gone

View from entrance with all plaster down


Cutting through cement for footing


Ready to pour concrete

Suspended lally column above footing

Poured Cement footing after inspection

Temporary walls

Cut floor joists, build supports for beams to lift


Beams in place and supporting floors above. Wires and ducts need to be moved/replaced.


Dining room side of house windows to be removed for create kitchen cabinet wall

Windows removed

New window in new location


Replace and move rear window that will go over kitchen sink


New siding will need to be painted

All ducts replaced and moved. Increased size of 3rd floor duct from 7" to 9" to accommodate central air conditioning

Almost ready for sheetrock


Original Electrical Panel


New Electrical Panel

Ready for inspection

Plastering completed - Kitchen cabinets about to be hung...

Cabinets up...









